HOT-236 Optics Readme file by: Dan Sadler 11/1/11 Calibrations at BEACH Lab. Calibrated LISST Batt. = 7.92, Cleaned windows. File: h236cal1.asc Calibrated AC-9 - cleaned windows - file: ac9_110111_air.dat, ac9_110111_22_5_cal1.dat ac9_110111_23_1_cal2.dat Calibrated AC-S - cleaned windows - files: acs_110111_air.dat, acs_110111_22_9.dat A659.0 : 0.006 A567.6 : 0.008 A480.3 : 0.011 C662.4 : 0.082 C570.7 : 0.059 C479.0 : 0.017 Calibrated FL-3 - file: h236eco1.raw 11/2/11 Loading Day Began charging FRRF and DH4 batteries 11/4/11 HOT Day 2 FRRF comms box light off, no power, got shocked touching box Replaced multiple outlet adaptor on extension cord Checked FRRF Batt. = 14.46V Set Time to HST Reformatted flash memory Checked DH4 Batt. = 12.4V Cleared files Checked LISST Connected battery Batt. = 7.59V 11/5/11 HOT Day 3 FRRF/DH4/LISST cast - in:1242, down:1248, up:1308, out:1319 - depth : ~ 190m using ship's winch - rate : 10 m/min down, ~20 m/min up - weather : 8/8 clouds, 20 knot winds, 8' swells - location : 22 46.633 N, 157 59.709 W - files : pro1h236.bin, l3091240.dat *NOTE: DH4 not blinking on recovery. No data collected. Deck Testing of Pumps: Since replacing the AC9 pump on HOT-235 was coincident with the DH4 working, I qualitatively tested the pumps by placing both AC9 and ACS pumps in bucket of water and started DH4. The AC9 pump had about 1/4 the flow rate of the ACS pump so I replaced it. The new pump had a similar rate to the ACS pump. Also, added filters to both pump inlets and observed the flow rate decreases dramatically, probably less than 1/2 the non-restricted flow rate. Magnetic Switch: Since we had problems with the DH4 magnetic switch on HOT-235, I checked the o-rings and fit. It seemed fine. Decided that on the next cast to verify the pump started up and the red light was still blinking before deploying. 11/6/11 HOT Day 4 FRRF/DH4/LISST cast - in:0306, down:0311, up:0331, out:0344 - depth : ~ 190m using ship's winch - rate : 10 m/min down, ~20 m/min up - weather : Dark clouds, 15 knot winds, 6' swells - location : 22 47.814 N, 158 00.089 W - files : pro2h236.bin, l3100301.dat, run.003 *NOTES: Trouble keeping station. Wire angle up to 45 degrees. DH4 light flashing on recovery. Yeah! Syringe left on frame. The tygon tube came off the CTD so data may still be good. FRRF/DH4/LISST cast - in:1214, down:1220, up:1239, out:1255 - depth : ~ 190m using ship's winch - rate : 10 m/min down, ~20 m/min up - weather : 2/8 clouds, 17 knot winds, 7' swells - location : 22 42.0413 N, 157 59.229 W - files : pro3h236.bin *NOTES: DH4 not blinking on recovery. No data collected. Forgot to switch on LISST before launching 11/7/11 Post Cruise at Snug Harbor Downloaded FRRF: Battery = 14.15V FRRF Deck Box power intermittent during cruise. May have been extension cord on ship. Seemed to work fine on dock with new extension cord. Files: pro1h236.bin, pro2h236.bin, pro3h236.bin Captured download session to h236post.txt and h236post2.txt Download LISST: Battery = 7.74V Files: L3091240.dat 11-05-11 1325 L3100301.dat 11-06-11 0349 Disconnected LISST battery Download DH4: Cleaned Windows Battery = 12.0V Files: run003 11/06/11 0302 run002 11/05/11 1628 on deck pump testing run001 11/05/11 1459 on deck pump testing Voltages before and after each run: 000 12.4 11.5 001 12.3 11.4 002 12.9 11.4 003 12.5 11.1 Items to Repair/Replace: DH4 problems - possible causes Magnetic switch - o-rings wrong size - replace Battery power - test battery pack and charger Pumps might be drawing to much current - test pumps Test pumps/recondition/replace. Electrical tape on tygon tubing is coming off and catches on hose clamps. Recommend replacing with black Norprene tubing (ID=1/2", OD=3/4", McMaster-Carr part #51075K56, http://www.mcmaster.com/#norprene-tubing/=eun6d7) Replace extension cord with one that accommodates 3 plugs at once without using adaptors. T handle hex driver for LISST battery (McMaster-Carr part #6286A19, http://www.mcmaster.com/#ball-point-t-handle-hex-keys/=euncd3) Make laminated deployment checklist (DWS).