HOT-142 Optics Readme file 11/23/02 Replaced AC-9 battery & re-charged: 1000 Checked AC-9 : 1210 - downloaded remaining data (run.003, run.004) - cleared memory Checked FRRF : 1343 - reset clock - reformatting flashdisk - voltage = 14.32 V, recharging PRR/TSRB cast : The times for p021123a.bin are 3 hours ahead due to the computer being set to OST (Oregon Time) opposed to HST. The remaining 2 profiles use the correct time. 11/25/02 Calibrating AC-9 : 1000 - temp = 25.8 C - voltage = 11.9 V - files : run.000, 25nov02a1.dat, 25nov02a2.dat, 25nov02c1.dat, 25nov02c2.dat The second calibration files were run right after the first after re-purging the lines of bubbles. Values may-or-may-not be better. AC-9/FRRF cast : 1300 - 1415 - depth : 300m - rate : 10 m/min - weather : 15-20 kt winds, overcast & raining - voltage : 11.5 V - files : run.001, pro1h142.bin 11/26/02 AC-9/FRRF cast : 330 - 445 (Night) - depth : 300m - rate : 10 m/min - weather : 10 kt winds, started raining near end - voltage : 11.1 V - files : run.002, pro2h142.bin Downloading AC-9 data - run.000, run.001, run.002 Re-charging AC-9 : 530-1142 AC-9/FRRF cast (w/o filter) : 1320-1414 - depth : ~240m - rate : ~10 m/min - weather : 10-15 kt winds, 6/8 clouds The first 2 deployments were done using the ships crane; but due to the wire slipping the sheave, the 3rd profile was done using the capstan. A 280m line was used, but we expect to have gotten only ~240m of line-out. AC-9/FRRF cast (w/ filter) - in:1417, down:1428, up:1452 - depth : ~240m - rate : ~10 m/min - weather : 10 kt winds, 4/8 clouds - voltage : 11.5 V - files : run.003, pro3h142.bin Downloaded AC-9 data : 1540 - run.003 Downloaded FRRF data : 1630 - pro1h142.bin, pro2h142.bin, pro3h142.bin